Saturday, October 20, 2012

Day 15 - Let the FRAMING Begin - PT 1 (Monday)

It doesn't take a rocket scientist to figure out I was making my daily drive by to see if the framing began on our home TODAY!  My excitement is on Level E upgrade!  Actually higher than that just not sure if the carpet upgrade was higher than an E but you get the picture!  lol smiley face

When I arrived the guys had began preparing the perimeter of the house and the steel beams were installed.  I could see across the pond that at least five guys were at work on LOT #52.  There roof is up and looking pretty good and now that the framing is near completion I can tell that it is an Milan w/Elevation A and next door on LOT #51 is a Rome w/Elevation A that is further along because they have the brick, siding, shutters, doors, drive way, etc etc. t.  Anyway this is where we are at the moment:  they plan to work until 7:00 pm tonight.

Not sure what was inside this package; however, it clearly states the correct model w/reverse plan!
Installed Steel Beams


This is Tobais reading the blueprints for guidance! Can't see Frank; however, the two of them are working together and later the other guys will join them from Lot #52.  I decided to bring them some lunch at 1:30 pm since they were going to be here for the entire day.  Two Large Papa John's Pizza's and Pepsi soda!

This picture shows how they installed the perimeter of the house with the wood and a piece of foam underneath it!

They are juggling wood from three different locations!
  The wood is scattered throughout the cul-de-sac!

It landed safely without breaking!  Wheww!

This is the baby trussel!!

I love how they label all of the pieces.  

Scattered!
This is a good thing because every piece that is pulled from the pile is being framed.

I am not sure what these pieces are called but they are attached to the perimeter of the roof frame.



The Ryan Homes Plastic Wrapping once the house is framed UP!

I have a full appreciation for this house building process.  All these pieces of wood represent some aspect of our home. I plan to follow Emrose's (Stark Ravin Ravenna) lead and write a scripture on the wall of each room.


The floor joists are installed.
I left the site today at this point around 2:00 pm and both my husband and I will return before it gets dark!

Have no clue where these pieces of wood will be framed but they are so pretty.
Wood has a whole new meaning to me.

13 comments:

  1. This comment has been removed by the author.

    ReplyDelete
  2. Wow!!! I am so excited for you I have butterfly's for your house!!! Can't wait to see more pictures :D

    ReplyDelete
    Replies
    1. I went back this afternoon and I had those same butterfly's when I saw the progress they made on installing the floor and window frames.

      Delete
  3. This is the best part of the build IMHO. It's so gratifying each day to see the house come together. All those bits and pieces fall into place forming your beautiful home! Congrats Nadase, you guys have been waiting on this for a long time coming! *High Five it out* :)

    ReplyDelete
    Replies
    1. HIGH FIVE!! It is an absolute pleasure to see all these pieces coming together (that includes the paper work, too). lol

      Delete
  4. Congrats!! This is so exciting.

    ReplyDelete
    Replies
    1. It is! Thank you, ymk! Wish you were blogging!!!!!

      Delete
  5. I have to say again, I'm SOOOOO glad you're able to actually be there and take pictures of all the details. You've definitely had the best framing pictures I've seen on any of the blogs! And it enables me to not feel guilty that I'm not able to do it. :D

    ReplyDelete
    Replies
    1. Thanks for the compliment Amanda! It brings me great joy to catch the work in the moment, in action. Glad these photos help because I love taking them.

      Delete
  6. Wow and wow and wow....Holy Cow chicka, look at you go!!Im super impressed with your progress. What a week!! Frame delivered on day 14 and framing begins on Day 15!! It doesnt get any better than that....really you are blessed, I know you waited a long time, but realize your progress is super super fast!! I knew something was going on, you were super quiet yesterday, I knew you were Creeping! Maybe next time instead of Pepsi give em'some Red Bull..hahahaha How nice of you, I bet they really appreciate it :)

    As I logged on this morning, I was awaiting your progress, and sure enough here it is!! So happy for you.....you know I'm living through you right now!

    Keep em' coming!!

    ReplyDelete
    Replies
    1. Thanks DW! It's been a fantastic week! I did find some red bull on the site yesterday. They need to bring us a dumpster because our lot looks filthy. It was also nice to see that you are going to include more pictures on your blog for your blurb book.

      Delete
  7. Is this house in the background a RH?

    http://1.bp.blogspot.com/-9EM2hetlQYY/UIL9Mh1jpYI/AAAAAAAACF8/ZfL0LQ11rgg/s640/IMG_2883.JPG

    ReplyDelete
    Replies
    1. Yes it's an RH home! It is an Avalon! It was one of the first of three houses to start the south side of our community at the Chapel.

      Delete